WATER PLANT NO. 5 WATERLINE AND SANITARY SEWER CONNECTION - NWHC MUD NO.5

Macer Xpress installed 195 linear feet of 20-inch water line for a future water treatment plant, including a specialized bore beneath a roadway using a 30-inch steel casing to protect the pipeline and minimize surface disruption. Additionally, 723 linear feet of 8-inch sanitary sewer pipe were installed, complete with three sanitary manholes for reliable access and maintenance. To improve safety and accessibility, the existing sidewalk and driveway were removed and replaced. The result is a well-finished project that strengthens the community’s infrastructure and supports its growing needs.